日韩va天堂网-日韩va亚洲-日韩va亚洲va-日韩va在线播放-日韩va在线观看-日韩v高清-日韩v国产v-日韩v精品在线观看

Shenzhen great tower Industrial Co., Ltd.

Analysis of installation process of pneumatic diaphragm pump

Views: Update time:2021-01-19

Analysis of installation process of pneumatic diaphragm pump

1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

Analysis of installation process of pneumatic diaphragm pump(圖1)

Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

主站蜘蛛池模板: 日韩乱轮综合网 | 91欧美日韩91桃色在线观看 | 蜜桃成人影院 | 91精品在线视频 | 日韩国产在线观看 | 国产一级淫秽大片 | 91免费国产在线观看 | 92福利| 免费va国产在线观看 | 日韩午夜片 | 国产又粗又猛又爽又黄的视频色戒 | 一区一区三区产品乱码 | 97密桃红颜佳人香满园中 | 亚洲香蕉 | 91国内精品线免费播放 | 尤物视频国产十八岁美女二区 | 一区不卡二区不卡 | 99伊人网| 午夜专区 | 综合九色综合欧美狠狠 | 成人国产精品日 | 免费看国产黄线在线观看 | 精品国产污污网站在线看免费 | 亚洲日本va午夜中文字幕一区 | 中文字幕在线不卡视频观看 | 中文字幕日 | 91精品啪| 日本不卡一区二区 | 亚洲欧美日本制服丝袜电影 | 国产免费一区二区三区 | 日韩欧美精品在线一区二区 | 在线中文字幕不卡 | 亚洲综合精品网站在线观看 | 亚洲精品成a人在线观看夫 人人弄狠五 | 国产精品视 | 国产在线精品一区二区三区精品 | 国产日韩中文字幕 | 亚洲熟 女毛茸茸 | 日本护士三级 | 韩国一区二区三区中文字幕 | 人人影视官方版app下载 |